News

News

Home>News>Content

What Are The Daily Maintenance And Upkeep Methods For Vertical Sewage Pumps?

Dec 25, 2025

Vertical sewage pumps can be used as general pipeline pumps for pressurized water supply in high-rise buildings, as well as for transporting sewage containing particulate fibers. In addition to transporting sewage, they are also suitable for use as drainage pumps, filtration flushing condensation circulation pumps, etc.

Maintenance and upkeep methods for vertical sewage pumps:

(1) Check for any looseness in the sewage pump pipeline and joints. Rotate the sewage pump by hand to see if it is flexible.

(⑵) Add bearing lubricating oil into the bearing body, and observe that the oil level is at the centerline of the oil gauge. The lubricating oil should be replaced or replenished in a timely manner.

(3) Unscrew the water inlet plug of the sewage pump body and inject water (or slurry). Self-priming sewage pump

(4) Close the gate valve, outlet pressure gauge, and inlet vacuum gauge of the water outlet pipeline.

(5) Tap the motor and try to see if the motor direction is correct.

 

null


(6) Start the motor, when the sewage pump is running normally, open the outlet pressure gauge and the inlet vacuum pump to see if they display appropriate pressure, gradually open the gate valve, and check the motor load condition at the same time.

(7) Try to control the flow rate and head of the sewage pump within the range indicated on the label as much as possible to ensure that the sewage pump operates at the efficiency point and achieve the energy-saving effect.

(8) During the operation of the sewage pump, the bearing temperature should not exceed 35C of the ambient temperature, and the maximum temperature should not exceed 80C.

(9) If any abnormal noise is found in the sewage pump, it should be stopped immediately to check the cause.

(10) When the sewage pump needs to be stopped, first close the gate valve and pressure gauge, and then stop the motor.

(11) During the first month of operation of the sewage pump, the lubricating oil should be replaced after 100 hours, and then every 500 hours thereafter.

(12) Regularly adjust the packing gland to ensure normal dripping inside the packing chamber (preferably in droplets).

(13) Regularly check the wear of the shaft sleeve, and replace it promptly if there is significant wear.

(14) When the sewage pump is used in the cold winter season, after parking, the drain plug at the bottom of the pump body should be unscrewed to drain the medium completely. Prevent frost cracking.

(15) If the sewage pump is not used for a long time, it is necessary to disassemble the pump completely, wipe off the moisture, and apply grease to the rotating parts and joints before installation.

Previous: Proper Use Of Sewage Submersible Pumps Can Prolong Their Service Life

Next: How Can We Operate A Vertical Pipeline Centrifugal Pump To Reduce Energy Consumption